Released in 2026, the Final Integrated Feasibility Report (IFR) and Environmental Impact Statement (EIS) marked an important milestone in the collaboration between the U.S. Army Corps of Engineers (UASCE), Port of San Francisco, and the City of San Francisco on the San Francisco Waterfront Coastal Flood Study (Flood Study).
The following Final Report and EIS documents are available for download and review:
Appendix A: Plan Formulation (PDF)
Appendix B: Engineering (PDF)
- Sub-Appendix B.1: Hydrology, Hydraulics and Coastal and Attachment B.1.1: Coastal Extreme Water Levels and High Tide Flooding (PDF)
- Sub-Appendix B.1.2.1: Inundation Maps - Future Without Project (FWOP) and Future with Project (FWP) (PDF)
- Sub-Appendix B.1.2.2: Future Without Project and Future With Project 2040 Only Maps (PDF)
- Sub-Appendix B.1.2.3: Total Net Benefits Plan (TBNP) Maps and Sub-Appendix B.1.2.4: Total Net Benefits Plan (TBNP) Decadal Maps (PDF)
- Sub-Appendix B.2: Coastal Life Safety Risk (PDF)
- Sub-Appendix B.3: Earthquake Life Safety Risk (PDF)
- Sub-Appendix B.4: Array of Alternatives (PDF)
- Sub-Appendix B.5: Recommended Plan View and Sections (PDF)
Appendix C: Cost Engineering (PDF)
Appendix D: Environmental and Cultural Resources (PDF)
Appendix E: Economic and Social Considerations (PDF)
Appendix F: Real Estate Plan (PDF)
Appendix G: Monitoring and Adaptation Plan (PDF)
Appendix H: Public Involvement (PDF)
Appendix I: Engineering with Nature (PDF)
Appendix J: Changing Hydrologic and Meteorological Conditions (PDF)