Pier 70 Area - Building 12.jpg)
(Plate Shop No. 2)
Located near the south end of the Pier 70 site at the terminus of 22nd St., Building 12 measures 248’-2” x 242’-2” in plan by 59’-6” tall, and contains a total of 118,890 square-feet spread across two floors. Construction is steel and wood with corrugated steel cladding. The roofline is an Aiken configuration, with five raised, glazed monitors running east-west for the width of the building. It was constructed in 1941 as the central building of the New Yard as part of the WWII shipbuilding effort.
Building 12 housed the plate shop and mold loft for the WWII New Yard Complex and was central to hull construction at Slips 5-8. It is now used for impounded vehicle storage by Auto Return and the City’s MTA.
The content contained in the Port Web site has been prepared solely for the purpose of providing information about the Port and the Pier 70 area. The Port makes no warranties or guarantees of any kind, regarding its operation or the completeness of the content on its Web site or any other Web site to which it links. To the extent permitted by law, the Port disclaims all warranties from users of this Web site. The Port, its Directors and its employees, will not be liable for any damages of any kind arising from the use of information from this site or any site to which it links
Below is a table of available reports regarding Building 12:
| Document name |
Notes
|
Date
|
Author
|
Division origin
|
| Rapid Structural Evaluation |
-
|
2006
|
Moffat & Nichol
|
Engineering
|
| Port Pier 70 Building Cost Estimates, 10-Year Capital Plan Revised |
-
|
-
|
Kathleen Diohep
|
Planning & Development
|
| Seawall Lot 349 at Pier 70, Building 12 Complex: San Francisco Electrical Reliability Power Project Siting Analysis |
FINAL |
September 2003
|
Carey & Co, Inc. Architecture
|
Planning & Development
|
| Central Waterfront Cultural Resources Survey Results - Pier 70 Area |
By Building Number |
June 2002
|
-
|
Planning & Development
|
|
" "
|
By Age of Construction |
June 2002
|
-
|
Planning & Development
|
|
" "
|
By Table of Contents (Page No.) |
June 2002
|
-
|
Planning & Development
|
| Pier 70 Resources Profile Database |
Excel spreadsheet |
July 2007
|
Carey & Co.
|
Planning & Development
|
| Primary Record; Continuation Sheet; Building, Structure, and Object Record |
-
|
March 2001
|
Recorded by SF Planning Dept.
|
State of CA - The Resources Agency, Department of Parks and Recreation
|
| Architectural drawings |
1st floor plan, transverse section, schedule of machine tools, general data & utility services; 2nd floor plan & longitudinal sections |
Sept. 1944
|
Bethlehem Steel Co., Shipbuilding Division
|
-
|
BUILDING 2 - BUILDING 6 -BUILDING 12 - BUILDING 14 - BUILDING 21 - BUILDING 50 -BUILDING 101 - BUILDING 102 - BUILDING 104 - BUILDING 109 - BUILDING 110 - BUILDING 111 - BUILDINGS 113/114 - BUILDING 115 - BUILDING 116
BUILDING INDEX /MAP
.gif)
.gif)
.gif)
.gif)