
The Pier 43 Promenade Bay Trail project will extend The Embarcadero Promenade from Powell Street to Taylor Street, 880 feet into the heart of Fisherman’s Wharf. The Pier 43 Promenade will serve as a new pedestrian connection between Pier 39 and the historic Taylor Street crab sellers. The new Promenade will feature views of the Bay, the historic Pier 43 Ferry Arch and Alcatraz, and provide seating for hundreds. The project will remove most of the existing Pier 43½ (which was most recently used for parking), repair or reconstruct about 400 feet of shoreline at the 110-year old seawall, construct a pedestrian promenade over the water, and will include other sidewalk improvements between Mason and Taylor Streets.
Completion in Fall, 2012
Contacts
Project Planner:
Dan Hodapp, dan.hodapp@sfport.com
Engineering Project Manager:
Steven Reel, steven.reel@sfport.com